2011 Summer Projects

The 2010-2011 school year was a record year for Parkway Schools and the Facilities Division.  The division completed over $26.3 million of work district wide, making it our biggest construction year ever (with the exception of building a new school).  Ranging from renovations to capital improvements to site improvements, Facilities was responsible for a myriad of different projects – all completed on time for a successful start of the 2011-2012 school year.

South High - Science Addition & Renovations

A new 3-story science addition was added to the existing South High School building this summer.  The new Science Laboratory Building contains eight lab classrooms and four prep rooms, comprising approximately 16,000 square feet with a 20-foot tall open space below the second floor to allow for vehicle and pedestrian traffic.  These lab classrooms include laboratory counters, fume hoods, laboratory equipment such as bio safety cabinets, ice makers, glass washers, thermo cycles, refrigerators, Smart Boards, etc.  The project also included renovations of the current science wing on the third floor of the existing building, ceiling work on the second floor, and a 1,200 square foot expansion of the Commons Area.  Landscaping, tree removal, asphalt paving, concrete sidewalks, and a wood screen fenced dumpster pad will be part of the finishing touches to the exterior of the new addition. 

This project was funded through the 2008 Capital Improvement Program.

Northeast Middle - Performance Contract for Energy Conservation & Facility Improvement Projects

NEM - Old Chiller NEM - New Chiller

Energy conservation and facility improvements that have been underway at Northeast Middle since last summer (2010) were completed this summer.  This project included replacing the chiller and its associated pumps, installing a fire sprinkler system, replacing the HVAC systems, ceilings, and lights in the 200, 300, and 400 wings, replacing the HVAC systems that serve the cafeteria and main gym areas, and replacing the HVAC systems, ceilings, and lights in the 500 wing.  This portion of the project was funded by the 2008 Bond Issue.  The project also required that a large asbestos abatement be performed in the science classroom area of Northeast Middle.  As a consequence of the asbestos abatement work, some architectural, mechanical, and electrical systems had to be removed and reinstalled or repaired upon completion of the abatement work. 

This part of the project was funded through the 2008 Capital Improvement Program.

Room Renovations

Barretts - Partition Classrooms & Nurse's Area Renovations

Barretts - Old Nurse's Office
Barretts - New Nurse's Office

Barretts Elementary started the 2011-2012 school year with a new look on the inside.  Sections of the interior were renovated during the summer where a new nurse’s office is now located in the 500 wing. 

Barretts - New Main Office
Barretts - Old Main Office

Other exciting changes to Barretts’ insides are the remodeled Administration area, which included asbestos abatement in the flooring, and ten totally renovated classrooms. 

Barretts - Old Partition Wall
Barretts - New Wall

In order to accomplish these changes, accordion wall partitions were removed and several classrooms were totally reconfigured. 

This project was funded through the 2008 Capital Improvement Program.

Hanna Woods – Partition Classrooms, Repair Exterior Stucco Walls, and Replace Roofs

Hanna Woods - Old Classroom Area
Hanna Woods - New Classroom Area

Hanna Woods interior also received a new look for the new year. Through the construction of new walls and sound barriers, Hanna’s classrooms provide much better visual and auditory separation between the rooms, and offer a far fewer distractions for the students.  The exterior received a lot of attention with the repair and/or replacement of sections of the stucco finished walls, replacement of a section of the roof, and a new HVAC rooftop unit over the two classroom wing.

This project was funded through the 2008 Capital Improvement Program.

Henry - Partition Classrooms, Replace or Remove Skylights, & Asbestos Abatement Rebuild

Henry - Old Patition Wall Henry - New Wall Henry - New Carpet and Lighting

Yet another facelift this summer was at Henry Elementary.  Walls were installed between classrooms to provide improved auditory separation between the rooms. Other major changes to Henry consisted of replacing or removing deteriorated skylights, conducting a major asbestos abatement, and rebuilding finishes/ mechanical systems/electrical systems, and associated build back of the library/ music/cafeteria areas in the two-story wing of the building. 

This project was funded through the 2008 Capital Improvement Program.

Sorrento Springs - Partition Classrooms

Sorrento Springs - Old Classrooms
Sorrento Springs - New Classrooms

Sorrento Springs also saw several interior changes with the construction of walls to partition and separate open classroom areas. This project included extending the height of existing walls. The cabinets that lined the walls were moved to the original coat rooms, and the resource area of each grade level area was modified to remove the accordion walls and new permanent walls were installed. 

This project was funded through the 2008 Capital Improvement Program.

Synthetic Turf Athletic Fields - High School

Central High - Old Athletic Field
Central High - New Synthetic Turf Athletic Field

Everyone seems really excited about this project. The grass field areas inside the running tracks of all four high schools were transformed from irrigated grass fields to unirrigated synthetic turf fields and were completed in time for their first home games. This was a major accomplishment for the district. The addition of synthetic turf increases the availability of these fields for numerous organizations. Marching band and all levels of football, soccer, field hockey and women’s lacrosse now have access to these premier fields.

This project was funded through the 2008 Capital Improvement Program.

Replace Roofs and/or HVAC Systems

McKelvey – Replace Roofs & HVAC Units

McKelvey - Old Roof
McKelvey - New Roof

McKelvey Elementary received a new HVAC unit this summer to replace the old unit that serviced the1989 wing along with new roofing over that wing. The work included installing electrical connections for the new HVAC unit and extending the fire alarm system. 

This project was funded through the 2008 Capital Improvement Program.

Ross Elementary – Administrative Office Sightline Improvements & Replace Roofs

Ross - Main Office Demolition
Ross - New Main Office
Ross - Old Roof and Skylights
Ross - New Roof and Skylights

Over the summer, Ross’s main office area underwent changes to improve visitors’ sightline from the building’s entrance to the administrative offices. Two areas of the roof were also replaced.

This project was funded through the 2008 Capital Improvement Program.

South Middle – Replace HVAC Systems

South Middle - New Boilers
South Middle - Old Boilers

New HVAC systems were installed at South Middle this summer to replace the heating boilers and pumps along with associated piping, pumps, valves, gages, etc. in the mechanical room. This project also included miscellaneous work such as repairing the exterior concrete stairs and an exterior door to the mechanical room. 

This project was funded through the 2008 Capital Improvement Program.

Central High – Replace Roof & Relocate AHU

Central High - Old Roof
Central High - New Roof

Central High’s construction this summer included replacing a section of the roof over the 700 wing. The project also included relocating a five year old rooftop mounted heating, ventilation, and cooling air handling unit that was no longer needed in this area. The AHU was relocated on the rooftop over the cafeteria to replace the unit that serviced the rooms to the south of the cafeteria saving the district the cost of a new HVAC unit.

This project was funded through the 2008 Capital Improvement Program.

South High – Replace Roofs & Replace HVAC Systems

South High - Old Roof
South High - New Roof
 
South High - Old Roof
South High - New Roof

In addition to the new science wing and renovations to the existing science area, South High has also undergone the replacement of approximately 40% of the roofs on the main building and 30% of the roofs on the physical education wing. HVAC systems were replaced including two domestic boilers, heating/cooling mechanical units, and electrical panel boards. A new dehumidification air handling unit was also installed to control the humidity in the swimming pool area. 

This project was funded through the 2008 Capital Improvement Program.

West High – Replace Roofs

West High - Old Roof
West High - New Roof

West High was another building to receive new roofing this summer. The project consisted of replacing the roofs over the pool area, the art area, the south half of the main building core, over the connecting link between the main building and the 4-story addition, a stairwell on the south side of the main gym, and two small awning areas at the delivery area near the elevator tower. This project also included door replacements, and associated plumbing and electrical work. 

This project was funded through the 2008 Capital Improvement Program.

Central Middle – Sprinkler Center Core of Building

The fire sprinkler system at Central Middle was extended into the center core of the building from the cafeteria north to the hallway north of the library. This project was necessary to continue to meet an obligation to bring the building into compliance with current building codes. 

This project is being funded through the 2008 Capital Improvement Program.

Concrete / Asphalt Projects

Green Trails – Replace Pavement & Curbs

Green Trails - Old Pavement
Green Trails - New Pavement
 
Green Trails - Old Playground Area
Green Trails - New Playground Area
 
Green Trails - Old Playground Map
Green Trails - New Playground Map

Exterior work was done at Green Trails this summer to replace the pavement and curbs. This project included the installation of an asphalt driveway and parking area, asphalt paved play area, ADA ramp, concrete patio, playground equipment, as well as other related work. 

This project is being funded through the 2008 Capital Improvement Program.

South High – Replace Pavement, Curbs & Sidewalks

Another project at South High this summer was the removal and replacement of the athletic wing drive, the curbs, parking lot, perimeter sidewalks, and parking lot lighting in the lot located just outside the athletic wing exterior entrance and north of the tennis courts. 

This project is being funded through the 2008 Capital Improvement Program.

Site Projects

Claymont – Stormwater Drainage Improvements – South Property Line

Renovations were made to the stormwater drainage paths behind Claymont Elementary this summer. This work included installing various site improvements to lessen stormwater drainage onto adjacent properties and to eliminate erosion issues for neighbors along the south property line. A new storm drain, new concrete curb and paved drainage swale, and modifications to the contours of the existing landscape in this area will significantly reduce these issues. 

This project is being funded through the Program 554 regular budget.

North High – Replace Sanitary Sewer Line from Athletic Wing to the East

This North High project consisted of removing and replacing the old sanitary sewer line from exterior stairs at the athletic wing to the east property line. The exterior stairwell and the storm drainage at bottom of stairwell were demolished and replaced in order to gain access to the sanitary sewer. 

This project was funded through the 2008 Capital Improvement Program.

West High – Replace Main Water Line

This project consisted of replacing the existing water main line with a new fire and domestic water and relocating the water meter pit to the property line. 

This project is being funded through the 2008 Capital Improvement Program.